Equipment: mini digger, CAT hydraulic breaker, tracked barrow, pickaxe, chainsaw
Time Taken: Six and a half days
Job: Clearing site, hardcore, trees, breaking old subway heavy reinforced concrete structure, plus old water tank
People: Driver, 1 labourer (2-3 labourers supplied + project management)
Garden Pond
Equipment: micro digger, shovel, wheelbarrow
Time Taken: Three days
Location: Basildon
People: 1 Driver
House Extension Footings
Equipment: Mini digger > 450mm bucket
Time Taken: Two days
Materials: CAT Breaker
Location: Hornchurch
Job: Break surface concrete small footings
MOT Inspection Pit
Equipment: Micro digger > 600mm bucket
Time Taken: Two days
Materials: CAT Breaker
Location: Hackney
Job: Break surface concrete and dig 2.1m deep pit for an MOT inspection pit
Snow Clearance
Equipment: Micro digger > grading bucket
Time Taken: One day
Materials: Shovel
Location: Grays
Job: Clear snow and ice from flat tarmac area
Swimming Pool Fill
Equipment: micro digger, kango hammer, axe, rake
Time Taken: Two and a half days
Location: Brentwood
People: Driver, 1 Labourer
Job: Fill in pool with bank of soil and level off area for garden
Manouvered micro digger through front door, house and rear door - up a set of decking stairs and into garden. Demolish retaining wall and mud bank and start filling pool, packing mud as we dig. Layering pool with hardcore (from surround) every 2 feet, and again packing mud. Taking steel liner and supports off surround. Level off garden - ready to turf.